






Heavy-Gauge Steel Guardrails
Multi-rib tubular steel railings anchored with wedge slab fasteners rated to withstand repeated forklift strikes up to 12,000 pounds along high-volume assembly lines and primary transit lanes.
Structural Steel Bollards
Schedule forty and schedule eighty concrete-filled steel pipe bollards core-drilled directly into reinforced foundations to protect exterior transformers, overhead doors, and facility dock corners.
Automated Work-Zone Guarding
Modular woven wire mesh partitions with interlock-ready access gates that isolate robotic welding cells, high-speed stamping presses, and sensitive tooling bays from pedestrian floor traffic.
Four-Stage Installation Workflow
Laser Floor Diagnostics
Structural CAD Layouts
Fleet Field Staging
Core Anchoring
Design teams draft scaled floor-load schematics that calculate barrier deflection angles, emergency egress clearances, and verified OSHA equipment clearances.
Dedicated utility trucks arrive from our Romulus logistics hub stocked with pre-cut structural tubing, hardware components, and core-drilling rigs.
Certified technicians drill slab sleeves and torque heavy structural fasteners to rated specifications with zero disruption to active shift operations.
Field crews deploy 3D optical scanning to measure slab thickness, existing joint expansion lines, and active forklift routes across the operating plant floor.
Review Hardware Specifications
Submit site dimensions or request an on-site audit to receive stamped deflection calculations and certified layout drawings.
